Case Studies

Wembley Stadium Project, london


We're excited to be supplying contractors on the impressive Wembley Stadium project. Kernow are currently providing Unistrut, fixings, bracketry and site equipment. Delivering to the Stadium is a challenge due to the extensive restrictions imposed, including delivery slots and booking references, but that doesn't stop us delivering our Kernow-How to site!

 


 

Carbis Bay Development, Cornwall


Kernow Fixings have been working closely with the M&E contractors on a luxury seafront development in Cornwall, located on a blue flag award winning beach – Carbis Bay. Kernow provided the required fixings and support systems, pre-assembling support frames offsite to ensure the project ran smoothly and on time. Due to the coastal environment we supplied only fully corrosion-resistant materials for this project. Read More

 


 

Primark Distribution Hub, Northamptonshire


Kernow recently won the contract to supply the new Primark Distribution Facility in Northamptonshire. Kernow were privileged to provide all the containment and fixings for the M&E in this 1m square foot mega shed, amounting to 19,000 lengths of basket tray plus associated products. Over 6 artic lorry loads of basket were delivered to site in line with our customer's requirements.

 


 

Hemerdon Tungsten & Tin Project, Devon


The Drakelands Mine has one of the Western World's largest tungsten and tin resources and provides a secure supply of tungsten for a global customer base.  We worked closely to support most contractors on this major project, and supplied a vast range of products, from the heavy-duty cable ladder installed throughout the plant, to the steelwork fixings, to general consumables and tools.

 


 

58 Victoria Embankment, London

We have been very fortunate to be a major supplier to the M&E Contractor on this prestigious London project, delivering almost daily, overcoming delivery time slots, and tight site restrictions

 


 

Belgrave Square, London


Kernow were chosen to partner with the M&E Contractor for this high end refurbishment.  A landmark project, situated in one of the most prestigious locations, often referred to as Billionaires Square

 


 

ALD Automotive HQ, Bristol


Working with one of the largest M&E Contractors in the UK, Kernow have supplied all containment and associated supports and fixings to this project, located next to the M4, near Bristol.  This project was managed as a Call-Off, with scheduled deliveries.

 


 

Fulham Reach, London


Supporting this project on almost a daily basis, with the supply of support bracketry and associated products, we are delighted to have been chosen as the preferred supplier to the Sub-Contractors on this fastisitc development.

 


 

Beaufort Park, London


Situated in Hendon, adjacent to the M1, this ongoing huge development has been a pleasure to support.  Working with the M&E and Building Services Contractors, we have achieved timed, and scheduled deliveries to the client's complete satisfaction.

 


 

Energy-from-Waste Plant, Plymouth


South West Devon EFW Plant is one of the most efficient energy from waste plants in Europe which can process 250,000 tonnes per annum.  Kernow enjoyed supporting almost all contractors on this project, offering consignment stock on site, weekly meetings, and pre-fabricated support systems.

 


 

Cornwall Energy Recovery Centre, Cornwall


The Cornwall Energy Recovery Centre will process more than 320,000 tonnes of household waste per year and provide enough power for 21,000 homes.  We used dedicated vehicles to supply almost daily to this project, supporting many requirement.  With regular same-day deliveries and site meetings, we asisted contractors to minimise downtime and delays, supplying fixings, containment, and the FRAMO steel framing solution.  

 


 

20 Fenchurch Street, London


20 Fenchurch Street, also known as the 'Walkie Talkie' building hosts one of the highest solar panel arrays in Europe.  Kernow were favoured to be the preferred supplier for the complete support system and fixings behind this array.  Close liason with the contractor was critical to advise the most suitable fixings for this complex installation, and to deliver to this prestigious address in line with strict logistical requirements.